Projects - examples

 

 

 

 

 

 

 

 

 

 

 





Diley Road Intersection
Improvements & Traffic Signal

W.E. Stilson Consulting Group designed, prepared construction plans, and performed construction observation for improvements Diley Road in Pickerington.

This Project was prepared in two phases;
Part 1 provided the Diley Road & SR 256 Intersection to form a 90-degree intersection. 

The improvements included the construction of approximately 2,000 feet of a three-lane curb & gutter roadway section and sidewalks on both sides from the intersection of SR 256 west.  The intersection was signalized to accommodate traffic demands.  Under-drains and an enclosed drainage system were also included in the design.

Part 2 will be the improvements to SR 256.  These improvements will extend the existing 5-lane section south to the realigned Diley Road.  Pavements sections will have curb & gutter and sidewalk on the west side from the Kroger intersection to the improved intersection.


W.E. Stilson Consulting Group
355 E. Campus View Blvd. - Suite 250
Columbus, OH 43235

email@stilsonconsulting.com

614-847-4670 (office)
614-847-1648 (fax)

Contact Us | ©2005 W.E. Stilson Consulting Group
W.E. Stilson Consulting Group, LLC is not a successor to and has no relationship with Stilson and Associates, Inc.