W.E. Stilson Consulting Group designed, prepared construction plans, and
performed construction observation for improvements Diley Road in Pickerington.
This Project was prepared in two phases;
Part 1 provided the Diley Road & SR 256 Intersection to form a 90-degree
intersection.
The improvements included the construction of approximately
2,000 feet of a three-lane curb & gutter roadway section and sidewalks
on both sides from the intersection of SR 256 west. The intersection
was signalized to accommodate traffic demands. Under-drains and an
enclosed drainage system were also included in the design.
Part 2 will be the improvements to SR 256. These improvements will
extend the existing 5-lane section south to the realigned Diley Road. Pavements
sections will have curb & gutter and sidewalk on the west side from
the Kroger intersection to the improved intersection.