Pickerington--New Police Building
W.E. Stilson Consulting Group, LLC was retained by the City of
Pickerington for the design and construction administration of the New
Pickerington Police Facility.
This 19,500 sf facility is the main operations center for the police
department.
The building includes the following elements:
Administration for the Department
Dispatch area
Prisoner holding area
Staff service area
Indoor firing range
Employee training area
Secure sally port for transportation
Records storage
Controlled property room
W.E. Stilson Consulting Group was responsible for the overall project management
and design of all features of the facility from schematic design through
construction documents. The basis of design was to maintain the use
of coined-brick features as featured in many of the Olde Pickerington downtown
area.